FLOW Praises Gov. Whitmer for Upholding Public Trust Law on Line 5 by Revoking and Terminating Easement

Today’s announcement by Governor Whitmer and Department of Natural Resources (DNR) Director Eichinger that the State of Michigan, under the public trust doctrine, is revoking and terminating the 1953 easement allowing Enbridge to operate dual pipelines in the Straits of Mackinac—due to repeated violations of the easement—represents a clear victory for the Great Lakes and the citizens and tribes of Michigan, said FLOW executive director Liz Kirkwood today.

“As public trustees of our waters, the State of Michigan is affirmatively upholding the rule of law and protecting the public’s treasured Great Lakes from the clear and present danger of an oil spill catastrophe from Enbridge’s Line 5 pipeline.”

“This is an historic day of state leadership by the Whitmer administration brought about by many years of dedicated action by environmental groups, Indian tribes, communities, businesses, faith communities, families, and individuals. People of diverse backgrounds have come together to work tirelessly on a common purpose—protecting the Great Lakes, drinking water, fishing rights, the economy, coastal communities, and a way of life from the most dangerous oil pipeline in America.

“While this is a moment to celebrate, we must remain vigilant until the oil stops flowing for good in May 2021 because Line 5 remains exposed to uncontrollable and powerful forces, including exceptionally strong currents, lakebed scouring, new anchor and cable strikes, and corrosion. These forces dramatically increase the risk of this elevated, outdated pipeline collapsing and causing the unthinkable: a catastrophic oil spill in the heart of the Great Lakes.”

Since 2013, FLOW has filed extensive legal and technical reports with the State of Michigan, including most recently in November 2019, citing extensive evidence of Enbridge operating Line 5 illegally and risking the public’s water. For more information, see FLOW’s original news archive.

To view the State of Michigan documents relating to today’s announcement, click the links below:

FLOW Appeals ALJ’s Decision on Proposed ‘Line 5’ Oil Tunnel

Source of tunnel graphic: Enbridge’s 2020 application to the U.S. Army Corps of Engineers.

Source of tunnel graphic: Enbridge’s 2020 application to the U.S. Army Corps of Engineers.

________________________________________________________________________________________________________

FLOW on Nov. 6, 2020, filed an appeal with the Michigan Public Service Commission of the October 23 decision by Administrative Law Judge (ALJ) Dennis W. Mack granting in part Enbridge Energy Limited Partnership’s motion to exclude critical evidence from consideration by the MPSC in deciding whether to permit the siting of Enbridge’s proposed Line 5 oil pipeline tunnel through public trust bottomlands under the Straits of Mackinac, where Lake Michigan meets Lake Huron.

FLOW’s appeal seeks to allow evidence that the proposed, roughly four mile-long oil pipeline tunnel under the Great Lakes would commit the citizens of Michigan for another 99 years to the unnecessary generation of more harmful greenhouse gases. According to the Michigan Department of Health and Human Services, greenhouse gas emissions already have resulted in the impairment of Michigan’s public health and natural resources – effects that will get worse unless CO2 emissions are abated.

Nothing less than the authority of the MPSC to protect the people of Michigan, environment, climate, and public interest of the citizens of Michigan and the Great Lakes for years to come is at stake, according to arguments filed by FLOW and other intervenors and made orally at a September 30 hearing.

“Authorizing a billion-dollar fossil fuel infrastructure project is fundamentally at odds with what science tells us must be done to avoid the most catastrophic effects of climate change,” said Liz Kirkwood, executive director of FLOW, a Great Lakes public trust law and policy center based in Traverse City. “Eliminating the determination of ‘public need’ when granting a Certificate of Necessity makes no sense.”

FLOW’s appeal also contests the ALJ ruling that the MPSC need not make a finding of “public need” to transport up to 8 billion gallons of oil a year for nearly a century in an era of falling demand for crude oil and an economy rapidly shifting to renewable energy. The pipeline tunnel proposed by Enbridge is inseparable from the business of transporting oil through existing Line 5, the Candian company’s 67-year old pipeline that runs from Superior, Wisconsin, through Michigan and on to refineries in Sarnia, Ontario.

Several market indicators suggest that investment in new pipeline infrastructure is highly questionable in light of clear trends indicating a precipitous drop in oil consumption in future years. Analysis released on August 9 by BNP Paribas, the world’s 8th-largest bank, reports “that the economics of oil for gasoline and diesel vehicles versus wind-and solar-powered EVs [electric vehicles] are now in relentless and irreversible decline, with far-reaching implications for both policymakers and the oil majors.”

FLOW is joined by several other intervening parties in the case in appealing to the three-member MPSC to overturn the ALJ ruling. Lawyers filed a joint appeal on behalf of the Michigan Environmental Council, Grand Traverse Band of Ottawa and Chippewa Indians, Tip of the Mitt Watershed Council, and National Wildlife Federation, as well as a joint appeal on behalf of the Environmental Law & Policy Center and the Michigan Climate Action Network. Bay Mills Indian Community also appealed. Attorney General Dana Nessel also sought to support and join in the appeals filed by the groups and tribes.

FLOW’s appeal requests that the MPSC:

  1. Reverse the ALJ’s granting of Enbridge’s motion to exclude evidence of public need and likely environmental effects and alternatives related to the new tunnel and tunnel pipeline and the intended purpose of the tunnel project to engage in business and operations to transport crude oil as part of the tunnel project and the existing Line 5 in Michigan; and
  2. Remand to the ALJ to take appropriate action to incorporate the excluded evidence into the discovery and evidentiary hearing that will be submitted as a full case to the MPSC for final decision and order.

“We’re talking about water, climate, and the plummeting demand for crude oil,” said Jim Olson, FLOW’s founder and legal counsel. “The MPSC by law should fully consider and determine the effect on, and potential impairment to, the substantial risks, alternatives, costs, and damages, and the future of the State of Michigan under the public trust in the Great Lakes, environment, fishing, fishery habitat, and the communities, including tribal interests under long-standing treaties.”

“Enbridge’s attempted private takeover of the public’s bottomlands under the Straits of Mackinac for the tunnel project breaches the state’s duty to protect the public trust in the Great Lakes and is not good for the climate or Gov. Whitmer’s goals as the nation and world turn to clean energy for survival,” said Kirkwood.

Many groups, including FLOW and Oil & Water Don’t Mix, have articulated scientific and legal deep concerns about the Canadian pipeline company’s tunnel proposal and its lack of necessity, and risks to the Great Lakes, drinking water, the fishery in the Straits, Tribal rights, the Pure Michigan economy, the climate, and a way of life.

In more details, FLOW’s appeal asserts that:

  1. The ALJ erroneously restricted the Broad Authority of the Commission under Act 16 by excluding review of the new or extended business and operations to transport crude oil through the new tunnel and pipeline.
  2. The exclusion of evidence of “public need” under Act 16 is contrary to the law and deprives the parties the right to introduce evidence on questions of fact related to public need.
  3. The State of Michigan has made new commitments to integrate climate change into government decision-making.
  4. The duty to consider and/or determine the likely effects and alternatives under the Michigan Environmental Protection Act (MEPA) and its case law applies to the new tunnel and tunnel pipeline, and the intended purpose to extend the business and operations of Enbridge to the Straits and all of Line 5.
  5. MEPA requires an evaluation of feasible and prudent alternatives, including a “no action” alternative.

Enbridge’s giant tunnel, at roughly 20-feet in diameter, would house a new Line 5 pipeline to continue for another 99 years carrying up to 23 million gallons of oil and natural gas liquids a day through the public trust bottomlands of the Straits of Mackinac, where Lake Michigan connects to Lake Huron.

For more information, see:

Line 5 Oil Tunnel in the Great Lakes: Is the Die Cast for the Next 99 Years?

Photo: Jim Olson, FLOW’s Founder and Legal Advisor, makes arguments in a Sept. 30, 2020, court hearing conducted online. The hearing considered motions made by Enbridge regarding the proper scope of the Michigan Public Service Commission’s review of the proposed Line 5 oil tunnel.

_______________________________________________________________________________________________________

By Jim Olson

There was good news and bad news in a state administrative law judge’s October 23 ruling that addressed legal arguments over what the Michigan Public Service Commission (MPSC) can and cannot evaluate when deciding whether to permit the siting of Enbridge’s proposed oil pipeline tunnel project under the Straits of Mackinac, where Lake Michigan meets Lake Huron. 

First, the good news: Judge Dennis Mack rejected Enbridge’s attempt to escape accountability by restricting the MPSC’s review to the impacts associated with the mere installation of a new Line 5 oil pipeline into the tunnel after it is built. The MPSC must consider the impacts from construction to nearby surface waters, wetlands, and the overall safety of the location and construction of both the pipeline and the tunnel that would house it.

Now, the bad news: The judge granted the Canadian energy pipeline giant’s bid to exclude evidence from the MPSC’s review that the oil pipeline tunnel would worsen the climate crisis and cause other environmental harm. The judge also excluded from the MPSC’s consideration of the public necessity to transport up to 8 billion gallons of oil a year for 99 more years in an era of falling demand for crude oil and an economy rapidly shifting to renewable energy. 

Absent a successful appeal by FLOW or other intervening parties in the case to the three-member MPSC to overturn the ruling, as Julius Caesar said when he crossed the Rubicon, Alea iacta est—the die is cast.

Clockwise from top-left: Dennis Mack (Administrative Law Judge); Spencer Sattler representing MPSC staff; Assistant Attorney General Robert Reichel representing the Michigan Department of the Attorney General; Chris Bzdok, representing Michigan Environmental Council, Grand Traverse Band of Ottawa and Chippewa Indians; Christopher Clark representing Bay Mills Indian Community; Margrethe Kearney, ELPC attorney representing the Environmental Law & Policy Center and Michigan Climate Action Network.

September Court-Zoom Drama

Judge Mack’s ruling on the scope of evidence the MPSC can consider followed sharply divided legal arguments on September 23 in a Zoom call from lawyers for Enbridge, the Michigan Public Service Commission, the Michigan Department of Attorney General, Native American tribes, FLOW, and several other public interest organizations. The judge heard a wide range of legal arguments over the scope of the MPSC’s review of impacts, necessity, and alternatives to Enbridge’s proposed utility tunnel and tunnel pipeline. The tunnel would extend the life of Line 5 and facilitate the transport of as much in total as 800 billion gallons of crude oil through Michigan and under the bottomlands and waters of the Straits of Mackinac for almost another century. Nothing less than the authority of the MPSC to protect the people of Michigan, the environment, the climate, and the future public interest of the citizens of Michigan is at stake, according to arguments made orally and also filed by FLOW and others.

Lawyers for Enbridge, in court and in their filing, pushed to strip the MPSC of its authority to review anything but a simple replacement of old plumbing with new plumbing for Line 5 in the Straits. In short, Enbridge argued that the MPSC could not evaluate any impacts from the massive tunnel, the need for the tunnel in a rapidly declining market for crude oil, or the billions of dollars in damage and cost from rising Great Lakes water levels, flooding, and collapsing of infrastructure in Michigan tied directly to the burning of fossil fuels and climate change. Rather, lawyers for Enbridge argued the MPSC could look at only the physical impacts of removing old dual pipelines and replacing them with a new pipeline put in a new tunnel in the bedrock and mixture of rock and soil under the lakebed.

In contrast, the lawyers for intervening parties in the case—including on behalf of Michigan Attorney General Dana Nessel, Bay Mills Indian Community, Little Traverse Bay Bands of Odawa Indians, Grand Traverse Band of Ottawa and Chippewa Indians, FLOW, Environmental Law and Policy Center, Michigan Climate Action Network, Michigan Environmental Council, National Wildlife Federation, Tip of the Mitt Watershed Council—argued for a broader scope of review concomitant with the magnitude of the proposed 99-year $500 million+ tunnel and new pipeline. They argued that the tunnel and pipeline are inseparable, and that it is a single project that would commit the state of Michigan to the environmental and public health impacts of the transport of up to 8 billion barrels of crude oil a year, carried from Canada under the Straits of Mackinac and back into Canada to Sarnia’s Chemical Valley cluster of refineries and chemical plants.

Public Need, Public Interest, Public Trust, and a Private Tunnel

Lawyers challenging Enbridge pointed out that Act 16, the law that defines the MPSC’s scope of review, imposes three standards and findings before a utility project like this can be legally approved: (1) the demonstration of need to realize a true public need; (2) safety and consistency with the public interest; and (3) the project is a reasonable alternative. Lawyers for FLOW and the other groups and tribes also pointed out that the MPSC has a duty under the Michigan Environmental Protection Act (MEPA) to prevent and minimize likely impairment to the air, water, and natural resources, and the public trust in those resources, and to find there is no feasible and prudent alternative to the project. 

The question of a public need for the project faces the reality of rapidly falling demand for oil and a sea change in investment toward renewable energy and a conservation economy. There are alternatives to continuing to risk the Great Lakes and our water-based economy, including the obvious use of excess capacity in Enbridge’s greatly expanded oil pipeline across southern Michigan to Sarnia that replaced the corporation’s aged line that ruptured and caused the devastating 2010 Kalamazoo River oil spill disaster. Lawyers for the tribes made clear that the environmental impacts of the proposed oil tunnel pose serious threats to tribal fishing and sovereignty over their treaty waters. Feasible and prudent alternatives clearly exist that are more consistent with the public interest of the citizens of Michigan, and the Michigan Supreme Court has made it abundantly clear that the state has a duty to comprehensively consider the likely effects and range of alternatives in deciding the necessity of a project like the century-spanning tunnel and pipeline. [Highway Comm’n v Vanderkloot, 392 Mich 159 (1974)]

The public interest in this proceeding includes our environment, protected by the MEPA, but it is also defined by what the public trust in the air, water, and environment of our Great Lakes—an ancient, irrevocable legal principle that protects the overarching rights of the public to enjoy the Great Lakes for navigation, fishing, drinking water, sustenance, boating, and swimming. [Obrecht v National Gypsum Co., 361 Mich 399 (1960); Illinois Central R Rd v Illinois, 146 U.S. 387 (1892)] This public trust imposes an affirmative and perpetual duty on governmental agencies, like the MPSC, to protect these legal-beneficiary rights of citizens.

Enbridge’s Narrow View of Public Oversight

Enbridge tried unsuccessfully to avoid or narrow the MPSC’s review of the crude oil tunnel project last April, when it asked the MPSC to rule that the tunnel proposed today was covered by its ruling existing 67 years ago on the existing Line 5 pipelines in the Straits. Agreeing with FLOW and others, the MPSC rejected the attempt, and issued an order on June 30, as FLOW chronicled, that concluded, “the Commission finds that the Enbridge’s Line 5 Project involves significant factual and policy questions and complex legal determinations that can only be resolved with the benefit of discovery, comprehensive testimony and evidence, and a well-developed record.” [MPSC Order, June 30, 2020, Case No. U-20763]

The October 23 ruling by Administrative Law Judge Mack rejected Enbridge’s argument that the authority of the MPSC was restricted to replacing the old dual lines with a new single line in a tunnel. The judge ruled definitively, as argued by the organizations and tribes, that the tunnel is inseparable from the pipeline, and the impacts and operation of both must be considered. On the other hand, the judge interpreted more narrowly the MPSC’s June 30 order that signaled a desire for a “well-developed record” on all of the complex issues involved in the oil pipeline tunnel project. The judge’s decision rejected arguments by the Attorney General, organizations, and tribes that the MPSC must undertake a comprehensive evaluation of the need, safety, impacts, and alternatives, including the inherent commitment by the state to permit the transport of nearly a trillion gallons of oil over the next 99 years, the lack of need for this oil, and the devastating effects of climate change.

Context is King: Construction Project or Climate Change Nightmare?

All of the parties in the case will be evaluating the effect of the judge’s decision to allow consideration of the impacts of the tunnel and pipeline construction, but exclude consideration of overall necessity, impacts, and alternatives of the century-spanning tunnel and pipeline project. Any party has a right to request a full review and decision by the three members of the MPSC itself. The parties, conversely, could choose to proceed in a hearing set for February 12, 2021, with testimony and evidence limited by the judge to just the impacts of building the tunnel and moving the pipeline. If the latter course is taken, then indeed Michigan will have crossed the Rubicon on the climate crisis and protecting the Great Lakes and ourselves from the worst of it.

FLOW & Straits-Area Citizens Groups Call on State of Michigan to Deny Permits for ‘Line 5’ Oil Pipeline Tunnel in Straits of Mackinac

Citing inadequate legal authorization, an incomplete application, and lack of a comprehensive state review, FLOW and two Straits-area citizen groups called today in formal comments on the State of Michigan to deny pending permits sought by Enbridge to construct and operate a roughly four mile-long tunnel under the Great Lakes. 

The Canadian corporation’s giant tunnel, at roughly 20-feet in diameter, would house a new Line 5 pipeline to continue for another 99 years carrying up to 23 million gallons of oil and natural gas liquids a day through the public trust bottomlands of the Straits of Mackinac, where Lake Michigan connects to Lake Huron.

The comments by FLOW, the Straits of Mackinac Alliance (SMA), and the Straits Area Concerned Citizens for Peace, Justice, and the Environment (SACCPJE) came at today’s deadline in legal and technical comments directed to the Michigan Department of Environment, Great Lakes, and Energy (EGLE) and Michigan Department of Natural Resources (DNR). The groups’ comments identify critical deficiencies in the project’s construction permit application filed in April, its legal authorization, and the review by state environmental agencies of expected impacts to wetlands, bottomlands, and surface water, including from the daily discharge of millions of gallons of wastewater during construction.

“Enbridge’s attempted private takeover of the public’s bottomlands under the Straits of Mackinac for the tunnel project is not authorized by the state, not good for the climate or Gov. Whitmer’s goals, not good for public health, safety, and welfare, and not consistent with public need as the nation and world turn to clean energy for survival,” said Liz Kirkwood, executive director of FLOW, a Great Lakes law and policy center based in Traverse City. 

“We share the public’s deep concerns about the Canadian pipeline company’s tunnel proposal and its lack of necessity, and risks it would pose to the Great Lakes, drinking water, the fishery in the Straits, Tribal rights, the Pure Michigan economy, the climate, and a way of life,” said Kirkwood. “The biggest consequence right now of this proposed project is that it distracts the government from its duty to shut down the current Line 5 oil pipelines that pose a clear-and-present danger to the Great Lakes.”

To date, more than 2,600 members of the public—including individuals, families, business owners, community leaders, organizational leaders, and others—have filed comments with EGLE urging the agency to reject Enbridge’s proposed tunnel permits. Many groups, including FLOW and Oil & Water Don’t Mix, have articulated scientific and legal deep concerns about the Canadian pipeline company’s tunnel proposal and its lack of necessity, and risks to the Great Lakes, drinking water, the fishery in the Straits, Tribal rights, the Pure Michigan economy, the climate, and a way of life.

The comments Enbridge’s proposed oil pipeline tunnel submitted today by FLOW, SMA, and SACCPJE determined that EGLE:

  1. Cannot properly proceed on administering the Enbridge permit applications unless and until the December 2018 easement and tunnel lease have been authorized under the Public Trust Doctrine (PTD) and Great Lakes Submerged Lands Act (GLSLA);  
  2. Must undertake an analysis of the lifetime greenhouse gas emissions attributable to the proposed tunnel, particularly in light of Governor Whitmer’s Executive Directive 2020-10 setting a goal of economy-wide carbon neutrality by 2050. Extending the life of Line 5 for the next 99 years with  the tunnel project is fundamentally at odds with the reduction of greenhouse gases necessary to avoid the most catastrophic effects of climate change.
  3. Is required to measure the benefits of the proposed tunnel against its reasonably foreseeable detriments, under Part 303 of the Natural Resources and Environmental Protection Act (NREPA), which includes determining the:
    1. Public and private need for the project; and 
    2. Availability of feasible and prudent alternative locations and methods to accomplish the expected benefits from the activity; and
  4. Is required to comprehensively and independently consider and determine whether the tunnel project is consistent with protection of Michigan’s natural resources under the Michigan Environmental Protection Act (MEPA). The state must determine whether extending the life of an oil pipeline that will emit approximately tens of  million tons of greenhouse gases annually for the next 99 years, under the state NREPA, “is consistent with the promotion of the public health, safety and welfare in light of the state’s paramount concern for the protection of its natural resources from pollution, impairment or destruction.”

EGLE expects to issue its final decision on the oil pipeline tunnel permits and for wastewater impacts in late November and impacts to wetlands and submerged lands in early December. While Enbridge takes an estimated 5-10 years to study, seek permits, and build an oil tunnel, the 67-year-old Line 5 oil pipelines in the Straits would continue to decay and endanger the Great Lakes, jobs, and the drinking water supply for half of Michiganders. 

“The unique characteristics of the Straits of Mackinac make the area incredibly susceptible to disruption and destruction if EGLE approves the permits for Enbridge’s proposed tunnel,” said Patty Peek, Chair of the Straits of Mackinac Alliance. “The surrounding wetlands, shorebirds, waterfowl, and aquatic species will be in jeopardy from the millions of gallons of wastewater to be discharged daily into the surface waters of the Great Lakes. Local drinking water wells may be polluted and/or drilling operations may imperil the aquifer. Missing information and a lack of specificity on applications cannot be acceptable. The risk to our precious waters is too great to allow this tunnel project to move forward.”

For more information, see:

Comment by Oct. 19 on Permits for Risky Line 5 Oil Tunnel

enbridges-line-5-under-the-straits-of-mackinac

On Monday, October 19, the Michigan Department of Environment, Great Lakes, and Energy (EGLE) will conclude its public comment period on pending state permits for the expected wetland and wastewater impacts, and alternatives to constructing and operating Enbridge’s proposed, roughly four mile-long oil tunnel under the Great Lakes. The proposed tunnel, at roughly 20-feet in diameter, would house a new Line 5 pipeline to continue for another 99 years carrying up to 23 million gallons of oil and natural gas liquids a day through the public trust bottomlands of the Straits of Mackinac, where Lake Michigan meets Lake Huron.

It’s important for the members of the public—including individuals, families, business owners, community leaders, and others—to submit comments. Many people and groups, including FLOW and Oil & Water Don’t Mix, already have expressed deep concerns about the Canadian pipeline company’s tunnel proposal and its lack of necessity, and risks to the Great Lakes, drinking water, the fishery in the Straits, Tribal rights, the Pure Michigan economy, the climate, and a way of life. 

Below is guidance from FLOW on what to include in your written comments and how to submit them online by Monday’s deadline. EGLE expects to issue its final decision on the oil tunnel permits and for wastewater impacts in late November and impacts to wetlands and submerged lands in early December.

Points to Make in Public Comments by Oct. 19

FLOW is providing this content for you to draw from and supplement with your own information and perspective in your comment to EGLE on the proposed Line 5 tunnel permits:

  • Not authorized by the state — EGLE cannot properly proceed on administering the Enbridge permit applications unless and until the December 2018 Easement and tunnel lease have been authorized under sections 2 and 3 of the Great Lakes Submerged Lands Act and the Public Trust Doctrine.
  • Not good for the climate or Gov. Whitmer’s goals  — EGLE must take into account the lifetime greenhouse gas emissions attributable to the proposed petroleum tunnel, particularly in light of Governor Whitmer’s Executive Directive 2020-10 setting a goal of economy-wide carbon neutrality by 2050. Extending the life of Line 5 for the next 99 years with  the tunnel project is fundamentally at odds with the reduction of greenhouse gases necessary to avoid the most catastrophic effects of climate change.
  • Not good for public health, safety, and welfare — EGLE is required to determine whether extending the life of an oil pipeline that will emit approximately tens of  million tons of greenhouse gases annually for the next 99 years, under the state Natural Resources and Environmental Protection Act, “is consistent with the promotion of the public health, safety and welfare in light of the state’s paramount concern for the protection of its natural resources from pollution, impairment or destruction.”
  • Not a public need for the oil tunnel — EGLE must make a number of specific determinations, including whether the benefits of the project outweigh reasonably foreseeable detriments, the extent to which there is a public and private need for the project, and whether there are feasible and prudent alternatives to the tunnel project. Unless these determinations are clearly demonstrated by the applicant Enbridge, the permit is prohibited by the Michigan Environmental Protection Act and the Wetlands Protection Act.

How to Submit Your Comments to EGLE by Oct. 19

Be sure to submit your comments on Enbridge’s proposed Line 5 oil tunnel by the Monday, Oct. 19 deadline. The public can submit comments either by email to EGLE-Enbridge-Comments@Michigan.gov — referencing Application Number HNY-NHX4-FSR2Q — or via two EGLE web pages for commenting separately on each of the permits. Click on each link below and follow the instructions provided by the state:  

  • EGLE public comment page for Part 303 wetland impacts and Part 325 Great Lakes submerged lands impacts.
  • EGLE public comment page for National Pollutant Discharge Elimination System (NPDES) wastewater impacts.

How to Learn More about Line 5 and the Risky Oil Tunnel

To learn more about Enbridge Line 5 and the proposed oil tunnel, see these resources on FLOW’s website:

Thank you for speaking up for the Great Lakes, drinking water, and a way of life here in the Great Lakes State!

Speak Up for the Great Lakes at EGLE’s Line 5 Tunnel Hearings Starting Tuesday

enbridges-line-5-under-the-straits-of-mackinac-4f9997139d321d60

Starting Tuesday, Sept. 29, the Michigan Department of Environment, Great Lakes, and Energy (EGLE) will host four online public hearings and receive public comment on the expected wetland and wastewater impacts of constructing and operating Enbridge’s proposed, roughly four mile-long oil tunnel under the Great Lakes. The tunnel would house a new Line 5 pipeline to continue carrying up to 23 million gallons of oil and natural gas liquids a day through the public trust bottomlands of the Straits of Mackinac, where Lake Michigan meets Lake Huron.

It’s important for the members of the public—including individuals, families, business owners, community leaders, and others—to sign up ASAP to comment at these online public hearings using the links below because public comment during the meetings likely will be first-come, first-served.

To assist you, FLOW is providing guidance below on the public hearing schedule that runs from Sept. 29 to Oct. 8, how to sign up to comment, key points to consider making, and a template email you can tailor and submit as your written comment too by the Oct. 19 written comment deadline.

Hearing Schedule—Click a link below to register via Zoom and select “Yes” where it asks, “Would you like to make an official comment at this hearing?”:

Points to Make in Public Comments at the Public Hearings — FLOW is providing this content for you to draw from and supplement with your own information and perspective. EGLE will provide up to 3 minutes for each public comment. Start by stating your name, where you live, and if you are representing an organization, indicate which one. Here’s our guidance:

Not in Support:

  • I urge EGLE and the state of Michigan to deny Enbridge’s wetlands resource and NPDES wastewater permit requests to build a tunnel for the Line 5 oil pipeline through the public trust bottomlands of the Straits of Mackinac for the following reasons: 1. Enbridge’s application and project description is too narrow, and does not consider the cumulative effects, the existence of alternatives to the tunnel and wetlands related project purpose pursuant to Sections 303011(1) and 30311(4)(b) of the Wetland Protection Act.

Not Lawful:

  • Not authorized — The new easement (December 2018) granted by the former Snyder administration to the Mackinac Straits Corridor Authority and assigned to Enbridge for the proposed tunnel is invalid because it has not been authorized based on the required determinations of the Part 325 of the Great Lakes Submerged Lands Act and/or section 2129 of the public utility easement in bottomlands of Great Lakes law, MCL 324.2129.

Not a Solution, nor the Best Alternative:

  • It is clear that taking 5-10 more years to study, seek permits, and build a crude oil tunnel under the Straits of Mackinac is not a solution because it fails to address Line 5’s immediate threat to the Great Lakes and Pure Michigan economy and the risk posed by the pipeline’s more than 400 stream and river crossings in the Upper and Lower Peninsulas. 
  • Enbridge’s proposal to allow electrical lines and other infrastructure to occupy the proposed oil pipeline tunnel is a bad idea that poses an explosion risk.

Not Fully Disclosed:

  • Enbridge has indicated that the size of the proposed tunnel will increase from a 10 ft diameter to an 18-21 foot diameter, yet Enbridge continues to use the original estimate of $500 million. Since consumers will ultimately pay for the tunnel, it is important to determine the new estimated cost.  
  • The announcement by EGLE that it will defer to other agencies or the MPSC to consider the likely effects and alternatives of the proposed tunnel project is contrary to the law of Michigan under the Michigan Environmental Protection Act (MEPA). MCL 324.1701 and applicable court decisions.

Not Acceptable — Wastewater and Wetland Impacts:

  • Enbridge is requesting to release up to 5 million gallons/day of treated wastewater back into Lake Michigan on the south shore and up to 14 million gallons daily during storm events. What chemicals will be used in the tunneling process and how will the wastewater be treated to remove those chemicals? 
  • If the waters of the Straits are contaminated, there would be extremely negative impacts to fish populations, tribal fishing rights, and communities who rely on drinking water from the lake and tourism business. How can EGLE consider this permit without having the full details about treatment plans and what chemicals will be used?
  • Doubling the tunnel diameter also results in quadrupling the volume, with four times as much excavated materials to be removed, staged, and disposed of. What are the increased environmental risks associated with the excavation, staging and disposition of these materials?
  • Michigan courts have consistently recognized that the Michigan Environmental Protection Act (MEPA) imposes additional environmental review requirements that are supplemental to existing administrative and statutory requirements. Is EGLE conducting a thorough review under MEPA?

Not in the Public Interest:

  • A permit under Part 303 Wetland Protection “shall not be approved unless the department determines that the issuance of a permit is in the public interest… In determining whether the activity is in the public interest, the benefit which reasonably may be expected to accrue from the proposal shall be balanced against the reasonably foreseeable detriments of the activity.” Clearly this project is not in the public interest when considering the impacts to public surface waters, public bottomlands, public drinking water supplies, the climate, and economy.
  • A permit under Part 303 Wetland Protection Act “shall not be approved” unless the applicant demonstrates the “need” for the project; clearly, this project is not needed given the obvious decline in demand for oil in the U.S. and world, and because Enbridge’s and Michigan’s future needs for crude oil can be satisfied by the existing crude oil pipeline system in North American and the U.S; and, because the design capacity of Line 6b (now 78) across southern Michigan from Indiana to Sarnia and Detroit or Toledo was doubled when replaced in 2012-2014, which can reasonably handle all of the volume of crude oil and natural gas liquids transported by Line 5 and Straits dual pipelines.

Not Good for the Climate nor Economy:

  • Line 5 conveys approximately 8.4 billion gallons of oil and natural gas liquids per year, and when burned, yield over 57 million metric tons of CO2 annually. How can EGLE authorize the tunnel in the face of the incontrovertible evidence of environmental and economic harm caused by climate change? 
  • Oil when burned, releases carbon dioxide, carbon monoxide, nitrogen oxides, particulate matter, and unburned hydrocarbons, impairing air quality and having monetizable environmental and health impacts. EGLE must compare the social costs against the benefits.
  • Continued capital investment in fossil fuel infrastructure is fundamentally at odds with addressing the existential threat of climate change.
  • Federal agencies must determine the carbon emissions attributable to projects under the National Environmental Policy Act (NEPA); EGLE and the MPSC must undertake the same analyses under MEPA.
  • The construction of Enbridge’s proposed tunnel and pipeline project for the next 99 years is contrary to Governor Whitmer’s Executive Order on Building a Carbon Neutral Economy.  

Not the Best Alternative:

  • Under Part 303, EGLE must consider “the availability of feasible and prudent alternative locations and methods to accomplish the expected benefits from the activity.” EGLE must evaluate the following:
    • To what extent did the 2010 catastrophic failure and oil spill from Enbridge Line 6B into the Kalamazoo River watershed and the more recent temporary, full and then partial closure of Line 5 result in constriction of supply, market disruption, or price increases to end users?
    • Does Enbridge Line 6B in southern Michigan, now reconstructed with a larger diameter as Line 78, have the capacity to meet market demand if the tunnel is not built and Line 5 closes?
    • Is the carrying capacity of the existing network of North American pipelines sufficient to meet future needs? According to FLOW’s experts, available capacity and flexibility to meet energy demand in the Great Lakes region already exists in the North American energy pipeline system operated by Enbridge and its competitors without threatening our public waters and Pure Michigan economy.
    • Would cessation of Line 5 result in a new pipeline system equilibrium capable of meeting existing and future demand for oil and natural gas liquids?
    • What is the potential for the tunnel project to become a stranded asset and liability to the State of Michigan in the event market trends play out as predicted?

Written Comment Also Accepted — The public also can comment in writing at any time until EGLE’s comment deadline on Oct. 19. Here’s the:

  • Oil & Water Don’t Mix campaign’s public comment form for you to personalize — drawing from FLOW’s guidance provided above — and send, or you can use the EGLE links below.
  • EGLE public comment page for Part 303 wetland impacts and Part 325 Great Lakes submerged lands impacts.
  • EGLE public comment page for NPDES wastewater impacts.

Background — To learn more about Enbridge Line 5 and the proposed oil tunnel, see these resources on FLOW’s website: